Some Essential Formula and Example for Industrial Engineer (IE)

Some Essential Formula and Example for Industrial Engineer (IE)

Industrial engineering is a branch of engineering which is used to eliminate waste of time, money, materials, machine time, energy, person-hours, and other resources that do not generate value. As like other manufacturing industry, industrial engineering now widely used in textile and apparel industry. Textile and garment industry have to face heavy challenges due to various factors including global competition, production costs increase, less productivity/efficiency, labor attrition, etc. For overcoming those challenges industrial engineering knowledge and formulas are frequently used in apparel manufacturing industry. In this article I have given some important and popular terms and formulas of industrial engineering. I have also given some examples for which reader can easily understand. 


Some Important Formula & Example for IE


   1. Standard Pitch Time (S.P.T) = Basic Pitch Time (B.P.T) + Allowances (%) 
          

  • GSD = (Man power * Work hour) / Target          
  • SMV = Basic time + (Basic time * Allowance)          
  • Basic time = Observed time * Rating
  • Observed time = Total Cycle time / No of cycle
  • Rating = (Observed Rating * Standard rating) / Standard rating
  • Efficiency = (Earn minute * Available minute) * 100
  • Earn minute = No of Pc’s (Production) * Garments SMV
  • Available minute = Work hour * Manpower
  • Organization Efficiency = (Basic pis time / Bottle neck time) * 100
  • Basic pis time = Total GMT SMV / Total Manpower
  • UCL = Basic pis time / Organization Efficiency
  • LCL = 2 * Basic pis time – UCL
  • Capacity = 60 / Capacity time in minute
  • Cycle Time = 60 / Team target
  • Capacity Achievable = Capacity * Balance
  • Daily output = Work hour / SMV
  • Factory capacity = (Work hour / SMV) * Total worker * Working day * Efficiency
  • CPM = (Total over head cost of the month / No of SMV earners * Work minutes) *Efficiency
  • Required no of operator = Target daily output / Daily output per operator

Example:

1. Efficiency = Output/Input 

                      = (SMV*Product Quantity) / (Worker*Working Hour*60) 

                      = [(38.50*700) / (60*10*60)]*100 

                      = 74% (Line Efficiency) 

Here, 
SMV=38.50 
Working hour=10 
No. of worker=60 

2. Target/hour = (60/SMV)*Efficiency% 

                        = (60/0.85)*70% 

                        = 50 pcs/hour 

Here, 
SMV=0.85 
Efficiency=70% 

3. Target/line = [(No of worker*working hour*60)/SMV]*Efficiency% 

                       = [(75*10*60)/23.5]*60% 

                       = 1150 pcs 

Here, 
No of workers=75 
Working hours=10 
SMV=23.5 
Efficiency=60% 

4. Required days for the schedule = Total order quantity/Average target 

                                                         = 50000/2000 

                                                         =25 

Here, 
Average target=2000 
Order quantity=50000 

5. CM of garments= (Total Production)/(no of worker*work hour) 

                               = 250000/(1500*10) 

                               =1.66 BDT 

Here, 
Total Production=250000 
No of workers= 1500 

6. Factory capacity = [(Work hour*total workers*working day*60)/SMV]*Efficiency 

                                = [(10*1500*26*60)/14.13]*55% 

                                = 828025 pcs/month 


7. Line GSD/day = (Manpower*work hour)/target 

                             = (50*10*60)/900 

                             = 33

Comments

  1. Hi,

    I dont understand below formula, how is calculate a efficiency please explain step by step.

    1. Efficiency = Output/Input

    = (SMV*Product Quantity) / (Worker*Working Hour*60)

    = [(38.50*700) / (60*10*60)]*100



    = 74% (Line Efficiency)

    ReplyDelete

Post a Comment

Popular posts from this blog

Process Charts

Process Charts The charting of work flows, working processes, systems and procedures is a useful way of recording the essential features of a work situation for subsequent analysis. Process Charts are one of the simpler forms of workflow charting and are still in regular usage but are less common than they once were. This is unfortunate since it was the ubiquitous nature of the process chart that made it a common "language" between different groups of people and across different industries. A variety of process charts has been designed to meet the needs of a particular level or stage of analysis; they can be used at a detailed level (recording activity at a specific work station or workplace), but also at the wider system, process or procedure level. The different kinds of process chart share a common core set of symbols, though some have additional symbols for specific and specialised process steps. The common symbols (of which there are only five) were first promul...

Line Balancing in Apparel Production

Line Balancing in Apparel Production Line Balancing  Line Balancing is leveling the workload across all processes in a cell or value stream to remove bottlenecks and excess capacity. A constraint slows the process down and results if waiting for downstream operations and excess capacity results in waiting and absorption of fixed costs. Line Balancing in apparel industry It is the allocation of  sewing machine , according to style and design of the garments. It depends on what types of garments we have to produce. It is done to increasing  productivity .  When you consider mass production, garments are produced in lines or set of machines instead of single machine. A line may be assembly line, modular line or section, a line set with online finishing and packing. A line includes multiple work stations with varied work contents. Production per hour is varied depending on work content (standard minutes of particular task/operation), allocation of total ma...