Factors Influencing Productivity in Textile Industry

Factors Influencing Productivity in Textile Industry

Productivity:
Productivity refers to the physical relation between the quality produced (output) and the quantity of resource used in the course of production (input) 
Productivity (P) = Output (O) / Input (I)

Output implies production while input means land, labour, capital, management etc. Productivity measures the efficiency of the production system. Higher productivity means producing more from a given amount of input or producing a given amount with minimum level of inputs.
Productivity in Apparel Industry
In other words the more the output from one worker or one machine (or a piece of equipment) per day per shift, the higher is the productivity. Higher productivity is not to be taken in sense of higher workloads or faster machines alone but it is always elimination of waste of all type of labor (time and skill) machine time, capital, and material management etc. 
Productivity = Output per unit of input

Productivity and production are two different terms. Productivity is a relative term indicating the ratio between total output and the total inputs used therein on the other hand production is an absolute concept, which refers to the volume of output. The volume of production may increase but productivity may decline due to inefficient use of resource. Efficient use of input may increase productivity but the volume of production may not increase. Production refers to the end result of production system whereas productivity reflects its efficiency. 

Factors Influencing Productivity: 
Productivity is an economics term which refers to the ratio of product to what is required to produce the product in textile industry. There are many factors which can influence productivity in textile industry. Though there are both positive and negative influencing factors, it is more common to hear about and know those factors which adversely affect production. 

Factors influencing productivity can be classified broadly into two categories: (A) controllable (orinternal) factors and (B) un-controllable (or external) factors. 

(A) CONTROLLABLE (OR INTERNAL) FACTORS 
1. Product factor: In terms of productivity means the extent to which the product meets output requirements product is judged by its usefulness. The cost benefit factor of a product can be enhanced by increasing the benefit at the same cost or by reducing cost for the same benefit. 

2. Plant and equipment: These play a prominent role in enhancing the productivity. The increased availability of the plant through proper maintenance and reduction of idle time increases the productivity. Productivity can be increased by paying proper attention to utilisation, age, modernisation, cost, investments etc. 

3. Technology: Innovative and latest technology improves productivity to a greater extent. Automation and information technology helps to achieve improvements in material handling, storage, communication system and quality control. The various aspects of technology factors to be considered are:

  • Size and capacity of the plant,
  • Timely supply and quality of inputs,
  • Production planning and control,
  • Repairs and maintenance,
  • Waste reduction, and
  • Efficient material handling system.
4. Material and energy: Efforts to reduce materials and energy consumption brings about considerable improvement in productivity.
  • Selection of quality material and right material.
  • Control of wastage and scrap.
  • Effective stock control.
  • Development of sources of supply.
  • Optimum energy utilisation and energy savings.
5. Human factors: Productivity is basically dependent upon human competence and skill. Ability to work effectively is governed by various factors such as education, training, experience aptitude etc., of the employees. Motivation of employees will influence productivity. 

6. Work methods: Improving the ways in which the work is done (methods) improves productivity, work study and industrial engineering techniques and training are the areas which improve the work methods, which in term enhances the productivity. 

7. Management style: This influence the organizational design, communication in organization, policy and procedures. A flexible and dynamic management style is a better approach to achieve higher productivity. 

(B) UNCONTROLLABLE (OR EXTERNAL) FACTORS 

1. Structural adjustments: Structural adjustments include both economic and social changes.Economic changes that influence significantly are:

  • Shift in employment from agriculture to manufacturing industry,
  • Import of technology, and
  • Industrial competitiveness.
Social changes such as women’s participation in the labour force, education, cultural values, attitudes are some of the factors that play a significant role in the improvement of productivity. 

2. Natural resources: Manpower, land and raw materials are vital to the productivity improvement. 

3. Government and infrastructure: Government policies and programmes are significant to productivity practices of government agencies, transport and communication power, fiscal policies (interest rates, taxes) influence productivity to the greater extent.

Comments

Popular posts from this blog

Zaman etüdü

Zaman etüdü (Time Study,ing), gelişme olanağı yaratabilmek amacıyla, belirli bir faaliyeti ekonomiklik ve etkenlik yönünden etkileyen tüm kaynakları ve etmenleri dizgesel olarak araştırmaya ve insan çalışmasını geniş kapsamda incelemeye yönelik bir teknik olan  iş etüdünün ; bir çalışanın, belirli bir işi, belirli bir çalışma hızıyla yapması için gereken zamanı saptamak amacıyla gerçekleştirilen iş ölçümü tekniklerinden bir tanesidir. Zaman etüdü çalışmasının adımları şu şekildedir: 1.İş, çalışan, çevre koşulları konusunda tüm bilgilerin derlenip kaydedilmesi, 2.İşin öğelerine ayrılarak süreç tanımlamasının yapılması, 3.Örnek büyüklüğünün belirlenmesi, 4.Çalışanların, işin her bir öğesinin tamamlamaları için gereken zamanın ölçülerek, belirlenen tempo ile birlikte kaydedilmesi, 5.Gözlenen zamanın temel zamanlara dönüştürülmesi, 6.Çalışma için temel zaman dışında tanınacak toleransların belirlenmesi, 7.Çalışma için standart zamanın belirlenmesi Gözlenen zamanın temel zmana dönüşt

STANDART ZAMAN – GÖZLEM SAYISI

STANDART ZAMAN – GÖZLEM SAYISI   Bir orman endüstrisi işletmesinde herhangi bir iş devresine ait zaman ölçümleri aşağıdaki gibidir (Hata payını % 5, güven düzeyini % 95, paylar toplamı %15’dir).  a) Bu iş için gerekli standart zamanı hesaplayınız. b) Yapılan gözlem sayısının yeterli olup olmadığını hesaplayarak gösteriniz. c) Yapılmış olan tempo taktirleri hakkındaki görüşleriniz nelerdir?    Çözüm   a) Normal zaman   :  NZ=GZxD     Standart zaman  :  SZ = (1+P)xNZ    Standart zaman: SZ = 824.6 x (1 + 0.15) = 948.3 saniye  b) Gözlem sayısı  c) Ölçülen zaman arttıkça tempo azalmalıdır. Tabloda verilen tempo değerleri bu kurala çoğunlukla uymamaktadır.  Çalışma sorusu    - Bir orman endüstrisi işletmesinde iş etüdü uzmanı 09.00- 17.00 saatleri arasında 10 dakika süreli 10 gözlem yapmıştır. İş devresine ait zaman ölçümleri kronometre ile ve sürekli olarak yapılmıştır. Tabloda derece ve ölçülen zamanlar verilmiştir. Hata payı % 5, güven düze

Some Essential Formula and Example for Industrial Engineer (IE)

Some Essential Formula and Example for Industrial Engineer (IE) Industrial engineering  is a branch of engineering which is used to eliminate waste of time, money, materials, machine time, energy, person-hours, and other resources that do not generate value. As like other manufacturing industry, industrial engineering now widely used in textile and apparel industry. Textile and garment industry have to face heavy challenges due to various factors including global competition, production costs increase, less productivity/efficiency, labor attrition, etc. For overcoming those challenges industrial engineering knowledge and formulas are frequently used in apparel manufacturing industry. In this article I have given some important and popular terms and formulas o f industrial  engineering. I have also given some examples for which reader can easily understand.  Some Important Formula & Example for IE    1. Standard Pitch Time (S.P.T) = Basic Pitch Time (B.P.T) +