Process Charts

Process Charts

The charting of work flows, working processes, systems and procedures is a useful way of recording the essential features of a work situation for subsequent analysis.
Process Charts are one of the simpler forms of workflow charting and are still in regular usage but are less common than they once were. This is unfortunate since it was the ubiquitous nature of the process chart that made it a common "language" between different groups of people and across different industries.
A variety of process charts has been designed to meet the needs of a particular level or stage of analysis; they can be used at a detailed level (recording activity at a specific work station or workplace), but also at the wider system, process or procedure level.
The different kinds of process chart share a common core set of symbols, though some have additional symbols for specific and specialised process steps. The common symbols (of which there are only five) were first promulgated by the American Society of Mechanical Engineers and have become known as the ASME symbols.
Symbols

OPERATION:
 a main step, where the part, material or product is usually modified or changed

INSPECTION:
 indicates a check for quality or quantity


TRANSPORT:
 the movement of workers, materials or equipment
STORAGE: controlled storage in which material is received into or issued from a store, or an item is retained for reference purposes
DELAY or TEMPORARY STORAGE:indicates a delay in the process, or an object laid aside until required
These symbols are simply linked together in a vertical chart representing the key stages in a process; it is usual to place a commentary in an adjoining column recording contextual/environmental information. e.g. against a Transport symbol would be recorded, start of journey, end of journey, distance and mode of transport.
The simplest form of process chart is known as an outline process chart and records an overview or outline of a process. Only those steps of a process that can be represented by the ASME symbols of operation and inspection are recorded. An outline process chart is often a useful first step to identify key areas of concern before recording (part of) the process in more detail.
In a "full" process chart, where all symbols are used, it is common to chart the process from the "viewpoint" of the material being processed, the worker carrying out the work or, less commonly, a piece of equipment. Thus, the same symbols can be used in different ways. As a simple example, a piece of equipment can be represented on an equipment-type flow process chart as a delay because it is not in use; while a material-type flow process chart of the same process would show the material being transported to the next work station, and a man-type chart could show the operator involved in another operation on another machine.
The chart to be used may be determined by the purpose of the investigation or by the relative costs involved in the process - a highly capital-intensive process may focus more attention on the equipment being used.
Process charts may also be used at a more micro level of analysis. An example is the two-handed process chart which records the motions performed by both hands during a task. The sequence of motion of each hand is charted using the same symbols as before. There are slight changes to the meaning of the symbols, however. The delay symbol is used to indicate that the hand is waiting to carry out its next task. The storage symbol is used to indicate that the hand is holding on to a piece of material or a document. Two-handed process charts are usually drawn on a pre-formatted diagram. Their use has generally been superseded by the analyses involved in the use of low level pre-determined motion times systems.

Comments

Popular posts from this blog

Zaman etüdü

Zaman etüdü (Time Study,ing), gelişme olanağı yaratabilmek amacıyla, belirli bir faaliyeti ekonomiklik ve etkenlik yönünden etkileyen tüm kaynakları ve etmenleri dizgesel olarak araştırmaya ve insan çalışmasını geniş kapsamda incelemeye yönelik bir teknik olan  iş etüdünün ; bir çalışanın, belirli bir işi, belirli bir çalışma hızıyla yapması için gereken zamanı saptamak amacıyla gerçekleştirilen iş ölçümü tekniklerinden bir tanesidir. Zaman etüdü çalışmasının adımları şu şekildedir: 1.İş, çalışan, çevre koşulları konusunda tüm bilgilerin derlenip kaydedilmesi, 2.İşin öğelerine ayrılarak süreç tanımlamasının yapılması, 3.Örnek büyüklüğünün belirlenmesi, 4.Çalışanların, işin her bir öğesinin tamamlamaları için gereken zamanın ölçülerek, belirlenen tempo ile birlikte kaydedilmesi, 5.Gözlenen zamanın temel zamanlara dönüştürülmesi, 6.Çalışma için temel zaman dışında tanınacak toleransların belirlenmesi, 7.Çalışma için standart zamanın belirlenmesi Gözlenen zamanın temel zmana dönüşt

STANDART ZAMAN – GÖZLEM SAYISI

STANDART ZAMAN – GÖZLEM SAYISI   Bir orman endüstrisi işletmesinde herhangi bir iş devresine ait zaman ölçümleri aşağıdaki gibidir (Hata payını % 5, güven düzeyini % 95, paylar toplamı %15’dir).  a) Bu iş için gerekli standart zamanı hesaplayınız. b) Yapılan gözlem sayısının yeterli olup olmadığını hesaplayarak gösteriniz. c) Yapılmış olan tempo taktirleri hakkındaki görüşleriniz nelerdir?    Çözüm   a) Normal zaman   :  NZ=GZxD     Standart zaman  :  SZ = (1+P)xNZ    Standart zaman: SZ = 824.6 x (1 + 0.15) = 948.3 saniye  b) Gözlem sayısı  c) Ölçülen zaman arttıkça tempo azalmalıdır. Tabloda verilen tempo değerleri bu kurala çoğunlukla uymamaktadır.  Çalışma sorusu    - Bir orman endüstrisi işletmesinde iş etüdü uzmanı 09.00- 17.00 saatleri arasında 10 dakika süreli 10 gözlem yapmıştır. İş devresine ait zaman ölçümleri kronometre ile ve sürekli olarak yapılmıştır. Tabloda derece ve ölçülen zamanlar verilmiştir. Hata payı % 5, güven düze

Some Essential Formula and Example for Industrial Engineer (IE)

Some Essential Formula and Example for Industrial Engineer (IE) Industrial engineering  is a branch of engineering which is used to eliminate waste of time, money, materials, machine time, energy, person-hours, and other resources that do not generate value. As like other manufacturing industry, industrial engineering now widely used in textile and apparel industry. Textile and garment industry have to face heavy challenges due to various factors including global competition, production costs increase, less productivity/efficiency, labor attrition, etc. For overcoming those challenges industrial engineering knowledge and formulas are frequently used in apparel manufacturing industry. In this article I have given some important and popular terms and formulas o f industrial  engineering. I have also given some examples for which reader can easily understand.  Some Important Formula & Example for IE    1. Standard Pitch Time (S.P.T) = Basic Pitch Time (B.P.T) +